Public

BEL celebrates partnership with MSMEs

Navratna defence PSU Bharat Electronics Limited (BEL) participated in the National Defence MSME Conclave and Exhibition held at the Dussehra Ground, Kota, Rajasthan, on September 11-12, which is organised by the Department of Defence Production, Ministry of Defence, in association with the Society of Indian Defence Manufacturers (SIDM). The Conclave showcases Indian defence capabilities, empowers the armed forces and motivates students.

Honeywell to power HAL's HTT-40

HAL signed a contract worth over US$100 million for supply and manufacture of 88 TPE331-12B engines/kits along with maintenance and support services to power the Hindustan Trainer Aircraft (HTT-40).  The contract was exchanged by Mr. Eric Walters, Sr. Director OE Sales, Honeywell and Mr. B Krishna Kumar, Executive Director (E & IMGT) here today in the presence of Mr.

Q1 Results - BEL registers a growth of 96% in Turnover (YOY)

Navratna Defence PSU Bharat Electronics Limited (BEL) has achieved a Turnover of Rs.3063.58 Cr, during the 1st quarter of FY 2022-23 against the Turnover of Rs.1564.34 Cr recorded in the corresponding period of the previous year.

Profit Before Tax (PBT) during the 1st quarter of FY 2022-23 stood at Rs.578.10 Cr against the Profit Before Tax (PBT) of Rs.15.17 Cr recorded in the corresponding period of the previous year.

Keel Laid for 4th Survey Vessel Large

Keel for the fourth ship of Survey Vessel (Large) and second & third ships of Anti-Submarine Warfare Shallow Water Craft (ASW SWC) for the Indian Navy was ceremoniously laid on 17 Jun 2022 by VAdm SN Ghormade, Vice Chief of Naval Staff at L&T, Kattupalli in the presence of RAdm GK Harish, DGND (SSG), RAdm Sandeep S Sandhu, ACWP&A, Cmde P R Hari (Retd), CMD, GRSE, Cmde Ashok Khetan (Retd), Head L&T shipbuilding, Directors, and other senior officials of the Indian Navy, GRSE a

Work begins in Kaiga 5&6

The excavation of Kaiga 5&6 project at Kaiga, Karnataka commenced with ground break today. Senior officials of Nuclear Power Corporation of India Limited and contractors were present on the occasion. 

Kaiga 5&6 reactors are the first set of the ten indigenous 700 MW Pressurised Heavy Water Reactors sanctioned by the Government to be set up in fleet mode.